Overview


Room size (square feet) 2,000
Number of Racks 18
Average Power Density per Rack (kW) 12
Total Power Load (kW) 216
Total Heat Load (kW) 236
Single, Double, Combo Corded Equipment Double
Tier Level 4
Power Redundancy Methodology dual bus
Power Availability (9's) 99.999999
Incoming Power (phase) 3
Power Incoming // Outgoing (V) 480 // 208 / 120
Space Definition* Raised Floor
Monitoring Requirement / User Remote / IT and Facilities


Bill Of Materials

Foundation Racks 18 (9 per row - hot aisle/cold aisle)
UPS Type 2 x 610
UPS Output (kVA each) 300 each
UPS Ancillaries LBS Controller (wall mount)
UPS Standard Battery Runtime (minutes) -
Static Transfer Switch -
Power Distribution 2 x FPC
Managed Power Strips - MP 36
Cooling Type 2 x DS (Dual Compressors) 18 x XDV, 2 x XDC (Dual Pumps + Compressors) 80/160 + 160
Cooling Output (kW each / kW total) -
Monitoring 2 x MP-S Access Servers, 5 x OC web cards, 1 x Nform Software, 1 x Liqui-tech Panel with cable, 1 x Multilink Shutdown Software, 2 x BDS40 Battery
Service Recommendation Startup, Preventative Maintenance, Parts, Battery Services, Emergency Response, Remote Monitoring, Technical & Testing Service
Automatic Transfer Switch ATS


Line Drawings


Power One-Line Drawing

Cooling One-Line Drawing

Monitoring One-Line Drawing