Font Size:


Home
Information
White Papers and E...
      Scenario 12



Related PDF's

Corporate Capabilities Brochure

Assuring the Availability of Network Closets and Computer Rooms

Overview


Room size (square feet) 440
Number of Racks 10
Average Power Density per Rack (kW) 5
Total Power Load (kW) 50
Total Heat Load (kW) 55
Single, Double, Combo Corded Equipment Single
Tier Level 2
Power Redundancy Methodology n/a
Power Availability (9's) 99.99
Incoming Power (phase) 3
Power Incoming // Outgoing (V) 208 // 208 / 120
Space Definition* No Raised Floor
Monitoring Requirement / User Remote / IT and Facilities


Bill Of Materials

Foundation Racks 10 (5 per row - hot aisle/cold aisle)
UPS Type 1 x Npower (w/ battery cabinet)
UPS Output (kVA each) 60
UPS Ancillaries -
UPS Standard Battery Runtime (minutes) 5
Static Transfer Switch -
Power Distribution 1 x FDC
Managed Power Strips - MP 10
Cooling Type 1 x DS
Cooling Output (kW each / kW total) 59
Monitoring 1 x MP-S Access Servers, 2 x OC web cards, 4 x Nform Software, 1 x Multilink Shutdown Software
Service Recommendation Startup, Preventative Maintenance, Parts, Battery Services, Emergency Response, Remote Monitoring


Line Drawings


Power One-Line Drawing

Cooling One-Line Drawing

Monitoring One-Line Drawing

  © 2010 Liebert Corporation. All Rights Reserved. An Emerson Network Power Company.
 ::  Notice and Conditions  ::  Contacts  ::  Sitemap  ::  Liebert Locations  ::  Career Opportunities  ::  Emerson Network Power
 ::  Canada (Français)